News

Print
Press Enter to show all options, press Tab go to next option

Transform 66: Changes Coming to I-66 Near Fairfax City

Post Date:09/22/2019 4:03 PM

Drivers should be alert to changes coming soon to two locations near Fairfax City:

  • I-66 exit and entrance ramps at Route 123/Chain Bridge Road and Nutley Street
  • Access across Vaden Drive bridge near the Vienna/Farifax-GMU Metrorail Station

 

Changes to the I-66 ramps from Route 123/Chain Bridge Road will begin with replacing flyover ramps with signals. Click here to find out more about the Route 123 section of Transform 66.

 i66 123 interchange graphic 09-2019

 

 

The Vaden Drive bridge closure will take place from October 2019 through September 2020. Click here for more information from the Transform 66 website.

Drivers will detour on Nutley Street. Drivers will be able to access Metrorail garages from Vaden Drive, but will not be able to travel between them. This change should not affect CUE Bus riders, and pedestrians may walk through the pedestrian bridge at the Metrorail station. Cyclists should proceed with caution during this construction.

 Vaden Drive 09-2019

Information about these sections of the Transform 66 project was provided at a recent open house event; click on the links below to review the materials available at that event:

 

Changes to the I-66 entrances and exits from Route 123/Chain Bridge Road will begin with replacing flyover ramps with signals.

Transform 66 is a project transforming I-66 between the Capitol Beltway and Gainesville, Va.

Click here for information on each section of the project.

Return to full list >>